MEP Shop Drawings & BIM Coordination

Shop drawings coordinated
for the real world.

From strip mall fitouts to 30-story high rises — every project drawn in 3D, coordinated per submittals, contract documents, and SMACNA standards. Built for mechanical contractors who need drawings they can trust.

0 Projects to Date
0 Hours Worked
100% Drawn in 3D

MEP Services That Keep
Your Project On Track

We handle the coordination so your field crews can focus on installation. Every drawing is built to match real-world conditions — not just what's on the contract documents.

Sheet Metal / HVAC Ductwork

HVAC ductwork fabrication drawings coordinated per SMACNA standards with optimal routing and minimal joints. Full Revit MEP modeling for rectangular, round, and oval duct systems — drawn the way your sheet metal crews want to build it.

Mechanical Piping

Complete pipe routing, BIM clash detection, and fabrication shop drawings that match field conditions. Accurate hydronic, chilled water, and steam piping layouts with real clearances and access for maintenance.

Plumbing

Plumbing coordination drawings verified for installability — modeled with proper slope, pipe sizing, and insulation. We catch conflicts in the model so your crews don't find them in the ceiling.

Slab Openings & Sleeves

Penetration locations, sleeve sizes, and slab opening layouts delivered ahead of schedule. Coordinated across all MEP trades so your concrete pour goes right the first time.

Equipment Pad Layout

Mechanical equipment pad layouts drawn per submittals and engineer specifications. Precise dimensions for AHUs, chillers, pumps, and rooftop units — poured right the first time.

Total Station Points

Robotic total station layout points for precise hanger, sleeve, and opening locations. Exported directly from the BIM model — your field crews spend less time measuring and more time installing.

Projects Built on
Reliable Coordination

Healthcare, hospitality, judicial, mixed-use — we've coordinated MEP for projects across the Southeast that demand precision.

Clemson Development and Alumni Center Building — MEP coordination by Southeast BIM Services
Commercial

Clemson Development and Alumni Center Building

The Nieri Family Alumni and Visitors Center is a five-story, approximately 98,000-square-foot facility at Clemson University in Clemson, South Carolina, designed by Goodwyn Mills Cawood in partnership with Cooper Carry and built by Brasfield & Gorrie. Situated along the shores of Lake Hartwell adjacent to the Walker Golf Course, the building consolidates the Clemson Alumni Association, University Foundation, Admissions, Development Office, Career Center, Board of Trustees offices, and a golf pro shop and restaurant under one roof. The facility features a hybrid mass timber and steel structural system, electronically auto-tinting smart glass, and is designed to achieve Green Globes certification, opening in spring 2025 as Clemson University's premier front door for prospective students and returning alumni.

UGA Stanford Stadium South Sideline Expansion HVAC — MEP coordination by Southeast BIM Services
Sports

UGA Stanford Stadium South Sideline Expansion HVAC

Dooley Field at Sanford Stadium — home of the University of Georgia Bulldogs in Athens, Georgia — underwent a two-phase, $68.5 million south sideline renovation completed in time for the 2024 football season. The project expanded the 100-level south sideline concourse, added new restrooms and concession areas, improved ADA accessibility, and delivered major premium upgrades including the new 1929 Club, 350-level suites, six sky suites, and a state-of-the-art press box in the southwest corner of the stadium. Turner Construction served as the general contractor, with HOK (Hellmuth, Obata & Kassabaum) as the architect of record.

Cherokee County Water and Sewerage Authority New Office Plumbing — MEP coordination by Southeast BIM Services
Government

Cherokee County Water and Sewerage Authority New Office Plumbing

The Cherokee County Water and Sewerage Authority (CCWSA) new administrative headquarters is a multi-level, 50,000-square-foot civic office building located at 1307 Airport Drive in Ball Ground, Georgia, near the Cherokee County Regional Airport. The $27 million project, designed by CROFT Architects and built by Manhattan Construction Company, consolidates CCWSA operations previously spread across three separate Canton locations into a single modern campus. Groundbreaking took place in December 2025, with completion expected in the first quarter of 2027.

YF Tech — MEP coordination by Southeast BIM Services
Commercial

YF Tech

MEP coordination project — modeled in 3D, coordinated per SMACNA standards, delivered with confidence.

St. Theresa Catholic Church Addition — MEP coordination by Southeast BIM Services
Commercial

St. Theresa Catholic Church Addition

MEP coordination project — modeled in 3D, coordinated per SMACNA standards, delivered with confidence.

The Nexton Middle School — MEP coordination by Southeast BIM Services
Education

The Nexton Middle School

Nexton Middle School is a new public middle school being developed by the Berkeley County School District in Summerville, South Carolina, within the award-winning Nexton master-planned community near Charleston. Situated on approximately 35 acres near the intersection of Nexton Parkway and Midtown Avenue, the facility is designed to serve grades 6–8 with capacity for up to 900 students. Construction broke ground in December 2023 and the school is anticipated to open for the 2026–27 school year.

UPS Smart Hub — MEP coordination by Southeast BIM Services
Commercial

UPS Smart Hub

The UPS Southeast Metropolitan Automated Routing Terminal (S.M.A.R.T. Hub) is a 1.24-million-square-foot, highly automated package sortation and distribution facility located on Atlanta's westside near Fulton County Airport, designed by Randall-Paulson Architects. Opened in 2018, it ranks as the second-largest ground package processing facility in the United States and fourth largest in the UPS worldwide network, capable of sorting approximately 100,000 parcels per hour through 18 miles of conveyors, chutes, and belts. The facility features seven large 'finger' loading wings, a multi-story main office with observation deck, and was built to serve as UPS's primary regional hub for the southeastern U.S.

Bryan Mall High Rises Renovations Lever Hall — MEP coordination by Southeast BIM Services
Multifamily

Bryan Mall High Rises Renovations Lever Hall

Lever Hall is the final phase of Clemson University's $155 million Bryan Mall High Rise Renovation project in Clemson, South Carolina — a comprehensive overhaul of three 11-story residence halls (Byrnes, Manning, and Lever) originally built in the late 1960s that collectively house approximately 1,400 students annually. Designed by Boudreaux + Little and built by Juneau Construction Company, the Lever Hall phase encompasses approximately 110,000 SF of student housing and 8,000 SF of amenity space, with upgrades including fully replaced MEP systems, ADA accessibility improvements, new 'wet-core' private bathrooms, and added study and social spaces on every floor. Lever Hall is scheduled to reopen for the Fall 2026 semester as the culmination of a multi-year effort to extend the useful life of these central-campus residence halls by another 40 years.

Your Drawings Shouldn't Be
a Guessing Game

We're a Southeast-based BIM coordination firm that works exclusively with mechanical contractors. We're not trying to be everything to everyone — we do MEP shop drawings and coordination, and we do it well.

Every project gets drawn in 3D, regardless of size. We coordinate per submittals, contract documents, specs, and SMACNA standards. When your foreman opens our drawings on site, the routing makes sense and the dimensions are right.

Being local means we're in your timezone, we pick up the phone, and we understand how projects move in this market. We've worked on everything from small strip mall tenant fitouts to 30-story towers — the standard doesn't change.

Every project modeled in 3D
Coordinated per SMACNA standards
Local presence, same timezone
Drawings built for efficient installation
267+
Projects to Date
62,400
Hours of Coordination
100%
Modeled in 3D

Frequently Asked
Questions

Answers to common questions about our MEP shop drawing and BIM coordination services.

We provide HVAC ductwork fabrication drawings, mechanical piping shop drawings, plumbing coordination drawings, slab opening and sleeve layouts, equipment pad layouts, and total station layout points. Every project is modeled in 3D using Revit and coordinated per SMACNA standards.

We serve mechanical contractors across the Southeastern United States, including Georgia, Florida, Tennessee, Alabama, South Carolina, North Carolina, and Virginia. Being based in Georgia means we're in your timezone and understand how projects move in this market.

Yes. Every project — from strip mall tenant fitouts to 30-story high rises — is fully modeled in 3D using Revit. This allows for accurate clash detection, proper clearance verification, and drawings that match real-world conditions.

We handle projects of all sizes, from small tenant fitouts to large commercial buildings and 30-story high rises. With 267+ projects to date and over 62,400 hours of coordination experience, the standard of quality doesn't change regardless of project size.

Contact us through our website form below, email sales@southeastbim.com, or call . Send us your plans and we'll give you a straight answer on timeline and pricing — whether you're in preconstruction or ready for coordination.

Ready to Get
Started?

Whether you've got a set of plans ready for coordination or you're still in preconstruction, reach out. We'll give you a straight answer on timeline and pricing.

PO Box 7028
Chestnut Mountain, GA 30502